To deliver an accessible and equitable library services within the designated area of responsibility so as to meet the educational, and informational needs of the community.
Department Name: Libraries &Heritage
Physical Address: 99 Umngeni Road, PO Box 917, Durban; 4001
Annual Reading Competitions such as storytelling, Spelling Bee, Quiz
Career Guidance Expos
Book Launches
Book talks
Seminars, Debates and awareness programmes
Holiday programmes
Celebrations for international and national days of importance (International library week, South African library week, World read aloud, World book day, World mother tongue Africa Month, National storytelling festival etc.)
Economic development programmes
Youth empowerment programmes
Women empowerment programmes
Literacy summit
Book Publishing
Read for Rewards
- How to borrow a book
Patron needs to have a library card
Patron can borrow a maximum of 10 books for a period of 14 days or two weeks and she/he can renew those books for further two weeks
- How to get a membership card?
Patron needs to visit the nearest library and request a membership form
A form needs to be completed by the applicant, in case of a junior/children’s parent or guardian must complete the form on his/her behalf.
The following documents need to be attached on the form for verifications by library staff
- Copy of ID
- Proof of address (Metro bill or a letter from local Councilor)
Swimming pools offer a means of social interaction and have the ability to bring diverse groups of people together. The primary aim for the Municipality’s swimming pools is to provide and maintain a safe aquatic environment for recreational and competitive activities.
Also, it aims to ensure that all citizens are water safe” with a Mission that 3.5 million citizens of eThekwini Municipality have the ability to utilize all Aquatic facilities and open water areas with the confidence of being water safe.
The City’s pools are divided into four (4) categories namely:
GRADE A: Olympic Standard, Electronic Systems, Heated and Indoor Competition.
It meets FINA (International standards)
GRADE B:Olympic Size 50 metre pool Competitive/Recreational
GRADE C: Non-Olympic size 25 x 25 m standard recreational pool
*Note: Kings Park, Lahee and Westville are paying pools throughout the year*
POOL OPERATING TIMES:
Summer period -(1st October to 30th April) :
Monday to Friday; 06h00 – 18h00
Saturday, Sunday and Public Holidays; 09h00-17h00
Saturday, Sunday and Public Holidays for Coastal Pools only 06h00 – 17h00
Winter period-(1st May to 30th September):
Monday to Friday; 09h30 – 17h00
Saturday, Sunday and Public Holidays; 09h00-17h00
There will be two hourly intermitted swimming times (this is affording all bathers access to the facility whilst adhering to COVID-19 protocols) i.e.
06h00 – 08h00 (swimming time)
08h00 – 08h30 (pool will be closed to disinfect common areas)
08h30 – 10h30 (swimming time)
10h30 – 11h00 (pool will be closed to disinfect common areas) etc until pool closure time
NB: There about 52 pools in the eThekwini Region
The below pools are ready to reopen
No.
Name of Facility
Area
Ward
Grade
Facility Maximum Capacity
1
Kings Park Pool
Battery Beach -Durban
27
A
90 (50 Indoor and 40 Outdoor)
2
Lahee Park
Pinetown
18
B
80
3
L.T King
Bluff
66
B
50
4
Austerville
Wentworth
68
B
50
5
Verulam
Verulam
03
B
50
6
Westville
Westville
18
B
50
7
Ntuzuma E
Ntuzuma
42
B
50
8
North Durban
Durban North
36
C
50
9
Tills Crescent
Brickfield
31
C
40
10
Bayview
Chatsworth -Unit 2
69
C
50
11
Croftdene
Chatsworth -Unit 5
73
C
50
12
Bellair
Bellair
65
C
50
13
Nagina
Nagina
13
C
50
14
Marianridge
Marianridge
13
C
50
15
Clermont
Clermont
22
C
50
16
Hambanathi
Tongaat
62
D
30
17
Belvedere
Tongaat
48
D
30
NO.
NAME OF FACILITY
AREA
WARD
GRADE
18
Buffelsdale
Tongaat
48
D
30
19
Isiphingo Hills
Isiphingo Hills
89
D
30
20
Reunion
Reunion -Isiphingo
90
D
21
Lamontville
Lamontville
74
D
30
22
Tiger Rocks
Isiphingo Beach
90
D
40
23
Inyoni
Amanzimtoti
97
D
40
24
Pipeline
Amanzimtoti
97
D
50
25
Illovo
Illovu
98
D
30
Coastal non-fenced Pools:
26
Anstey’s
Bluff
66
D
N/A
27
Brighton
Bluff
66
D
N/A
28
South Beach
South Beach-Durban
26
D
N/A
29
Laguna
Battery Beach -Durban
26
D
N/A
The following pools will not reopen due to current and planned repair and maintenance works:
Rainham
Rochdale
KwaMashu D
Stanmore
Balkumar Singh
Merewent
Sutton Park
Arena Park
Umlazi D
Umlazi G
Tesoriere
Dakota
Winkelspruit
Alex Bulley
Children Amusement Centre-C.A.C
Rachel Finlayson
Inanda (new pool being built in previously historical under invested area)
Umgababa((new pool being built in previously historical under invested area}
Umlazi BB
Firwood
KwaMashu G
Chesterville
Newlands
Shallcross
Find out more about various swimming codes that may be performed at our swimming facilities:
Schools; swimming lessons and galas
Baptisms
Swimming Clubs training
Synchronised swimming
Diving
Scuba diving
Underwater hockey
Water polo
Film and Photo shoots
Competitive swimming events
Programmes that are offered by the section to promote and build Social Cohesion and Nation building are:
Outreach programme (whereby our Lifesavers/Pool Supervisors teach swimming skills to school children, senior citizens and general members of the public
Education Awareness on operation of pool filtration; water purification; basic first aid, CPR and pool bylaws.
The Municipality affiliates with the following swimming stakeholders:
Kwa-Zulu Natal Aquatics – Developed and Developing Swimming Clubs
Lifesaving South Africa – various Stillwater Saving Clubs
ETHEKWINI TRANSPORT AUTHORITY: FIVE YEARS OF PROGRESS IN BUILDING A SMARTER, SAFER, AND MORE CONNECTED TRANSPORT NETWORK
OVER the past five years, the eThekwini Transport Authority (ETA) has made significant strides in transforming the City’s transport landscape through strategic infrastructure investment, innovation, safety interventions, and progressive mobility planning. Highlighting these gains is the City’s Five-Year Service Delivery Milestones campaign being rolled out under the theme: Asimile Siyaqhuba: Resilience Through Adversity.
These milestones made by ETA reflect the City’s commitment to building an integrated, efficient, safe, and sustainable transport system that supports economic growth, urban regeneration, and improved quality of life for all residents.
ADVANCING TRANSIT-ORIENTED DEVELOPMENT
A key focus area has been the implementation of Transit-Oriented Development (TOD), which seeks to create connected, accessible urban spaces centred around public transport corridors.
The pilot that is being implemented in Pinetown will reshape how people live, work, and move by encouraging mixed-use development, reducing travel distances, and improving access to public transport services.
This initiative has allowed the City to assess practical interventions, gather operational insights, and refine strategies that can be replicated across other strategic transport nodes in eThekwini.
SUPPORTING INNER CITY REGENERATION
Transport infrastructure continues to play a vital role in supporting the regeneration of Durban’s inner city. Strategic upgrades to road networks, pedestrian facilities, public transport systems, and traffic management have contributed to improving accessibility, supporting commercial activity, and creating a more functional urban environment.
REDESIGNING PUBLIC TRANSPORT FOR THE FUTURE
Over the past five years, significant work has gone into redesigning public transport systems to improve efficiency, reliability, and user experience. This includes route planning improvements and operational integration efforts as part of the broader Integrated Public Transport Network (IPTN), and the development of systems such as closed-circuit television cameras on buses aimed at creating a more seamless public transport network for commuters.
LAUNCH OF THE PUBLIC TRANSPORT CALL CENTRE
The establishment of the Public Transport Call Centre has strengthened communication between commuters and the City. Channels such as telephone, WhatsApp and email provide residents with improved access to transport information, service updates and customer support, enhancing responsiveness and service delivery. Phone: 087 121 9446 WhatsApp: 071 374 1862 Email: Info@godurban.co.za
ELECTRIFICATION OF PUBLIC TRANSPORT
As part of its sustainability agenda, discussions and plans have reached an advanced stage for the City to shift toward the electrification of public transport. This milestone supports environmental objectives by reducing emissions, lowering operational costs over time, and positioning eThekwini to embrace cleaner mobility solutions.
SHEPSTONE ROAD CONVERSION
The successful conversion of Shepstone Road marks another important infrastructure milestone. This intervention has improved traffic flow, enhanced road safety, and strengthened network efficiency within and around the Point precinct.
SHAPING THE FUTURE THROUGH CIPT 2024–2029
The development of the Comprehensive Integrated Public Transport (CIPT) Plan 2024–2029 sets a clear strategic direction for the next phase of transport transformation. The plan outlines key priorities aimed at improving public transport accessibility, strengthening modal integration, and responding to evolving mobility needs across the City.
SAFER ROADS THROUGH GUARDRAIL AND SPEED HUMP IMPLEMENTATION
Road safety remains a core priority. The implementation of guardrails and speed humps across strategic locations has helped reduce risks for both motorists and pedestrians, contributing to safer road environments, particularly in high-risk areas. During the past two financial years, the City has implemented approximately 130 traffic calming projects across multiple wards, with an estimated investment of R12 million. The projects are aimed at reducing speeding, improving pedestrian protection, and enhancing safety in residential areas, school zones and other high-risk locations.
TRAFFIC SIGNAL INNOVATION
The City has continued to modernise traffic management through signal innovations designed to improve traffic flow and network responsiveness. Traffic vandalism has been a huge challenge within the City, and in the past three years approximately 6 000 traffic light repairs have been done costing the City R40 000. These advancements support smarter traffic control, reduced congestion, and more efficient movement across key intersections. These achievements represent more than infrastructure milestones. They reflect a broader vision of creating a transport system that is integrated, inclusive, resilient, and future ready.
As the City of Durban grows, evolves, and progresses, the focus from a transport perspective remains on innovation, safety, sustainability, and delivering solutions that meet these needs.